Pricing

One number, before workRevisions inside the quoteFirst task free

There is no per-page rate on this site and that is deliberate. Two WGU tasks of identical length can be a day apart in work, because one has six aspects and a template while the other has nineteen aspects, a scenario and a spreadsheet that has to agree with the narrative. So the desk prices the task, in writing, before anything begins, and the number does not move afterwards.

What a quote is built from

What sits inside every quote

The full draft in submission form, the artifacts the task requires, sourcing and citation work, the originality check, and the revision loop after an evaluator returns something. Revisions are not an upsell here. A task that comes back Not Yet Competent is unfinished work, and unfinished work is not something anyone should be charged for twice.

What sits outside a quote is anything added later: a second task, a scope change from your course, or a rewrite because you decided to take the argument somewhere new. Those get quoted the same way, fresh and before they start.

The free first task

Every student gets one task written at no cost, and it is a real one: your course, your aspects, your deadline, drafted from scratch. It is not a teaser excerpt and it is not a stock document with the name swapped. The logic is simple. Nobody can judge a writing desk from a testimonial, and the fastest honest way to prove a standard is to do the work once for free and let the evaluator settle the argument.

How payment runs

A quote arrives in chat or by email with the scope written out, the delivery date and the number. Accept it and work begins. Ignore it and nothing happens, because no card is taken to produce a quote. Paid work settles through a secure processor. There is no subscription, no retainer, no minimum order and no stored balance to burn down.

Getting a number

Send a course code and, ideally, the aspect list from your portal. Quotes usually come back within the hour, and a whole degree plan is as quotable as a single task. The scheduling mechanics live on how it works, and what you are owed once you accept is set out on guarantees.

Send it over

Confidential. WGU never hears from us; details go to the desk and nowhere else.

Questions students ask first

Why not publish a price list?

Because it would be wrong on most orders. Aspect counts vary hugely between courses, so a fixed table would either overcharge simple tasks or underquote heavy ones. A number built from your actual task is more honest and usually lower than a padded list price.

Is a whole course cheaper than its tasks bought separately?

Yes. The desk reads the build once, assigns one writer and shares research across the tasks, and the quote reflects that. The same applies to a backlog spanning several courses.

Does the price change if the task turns out to be harder?

No. The quote is fixed at acceptance. If the desk misread the scope, that is the desk's problem rather than a change order. The only thing that reprices is you adding work.

Do I pay before or after delivery?

The free first task is delivered before payment exists as a concept. After that, paid work settles at acceptance and the delivery date written into the quote is the one that holds.

Is there a rate for a whole term?

Term-length engagements are quoted as one plan and priced accordingly. Send the degree plan and the term end date, and the number covers everything you intend to clear inside it.